Free CMMC Level 2 checklist
Know your SPRS score before an assessor does.
All 110 NIST SP 800-171 requirements on one checklist, with what each one costs your score and which ones can't be left on a plan of action.
Get the free checklist- Every requirement with its SPRS points (5, 3, or 1), grouped by family, with a box to check off.
- The ones that must be met and may not go on a POA&M, marked clearly.
- Which requirements your machines can prove and which need records people keep.
- The 17 records assessors ask for that no machine can prove: who keeps each one and how often.
- How Conditional Level 2 works: the 88-point minimum and the 180-day close-out.
Built from the same requirement data Gardience uses to score fleets: the official NIST SP 800-171 Rev. 2 text and the DoD point values in 32 CFR 170.
Get the checklist
7-page PDF. It opens right away.
Your checklist is ready
Download it below. A copy of the link is on its way to your inbox.
Download the CMMC Level 2 checklist (PDF) Want to see your fleet scored live? Book a 15-minute walkthrough